Railways & Transport · 1873–1886 · Severn Tunnel Junction, Monmouthshire, Wales

The Severn Tunnel

The tunnel under the tidal Severn, 1886

The Severn Tunnel
Photo by Matt Buck, CC BY-SA 3.0, via Wikimedia Commons
📌 Pin it

The Great Western Railway built the tunnel between 1873 and 1886 to shorten the journey between South Wales and the West of England. Designed by Sir John Hawkshaw and built by contractor Thomas A. Walker, it runs 7,008 metres (4 miles 624 yards) from Pilning to Severn Tunnel Junction, of which 3.6 kilometres passes under the River Severn itself.

In October 1879 the workings were flooded by the Great Spring, a vast underground water source, and the tunnel was only saved by relentless pumping; some 76.4 million bricks line it, and the Sudbrook pumping station still drains it today. The final brick of the lining was laid on 18 April 1885.

Goods trains ran from September 1886 and the first passenger train followed on 1 December 1886, cutting the London to South Wales journey by about an hour. It was the longest underwater tunnel in the world until 1987 and Britain's longest mainline railway tunnel until 2007; it still carries around 200 trains a day.

Frequently asked

How long is the Severn Tunnel?

7,008 metres (4 miles 624 yards) in total, with about 3.6 kilometres of it running under the River Severn estuary between England and Wales.

Why was the Severn Tunnel built?

To replace the slow ferry crossing and give the Great Western Railway a direct, fast route between South Wales and the West of England.

Is the Severn Tunnel still in use?

Yes — it carries the South Wales Main Line, with around 200 trains a day passing through it.

Why it matters today

It was the proof that a railway could be driven beneath a tidal estuary — the Victorian precedent for the Channel Tunnel a century later, and for every sub-sea rail tunnel since.