Snowdon Mountain Railway
The rack railway to the roof of Wales, 1896

📌 Pin it
The idea of a railway to the summit of Snowdon was first proposed in 1869, but it took a Swiss solution to make it possible: Snowdon's slopes are far too steep for ordinary trains, with gradients as sharp as 1 in 5.5. The answer was the Abt rack system — a toothed rail laid between the running rails, gripped by a pinion wheel beneath the locomotive — imported from Switzerland along with the locomotives themselves, built by the Swiss Locomotive Works at Winterthur. The Snowdon Mountain Tramroad and Hotels Company cut the first sod in December 1894, and built the 4.7-mile line from Llanberis to the summit for £63,800.
The railway opened on Easter Monday, 6 April 1896, and its first day ended in disaster. Locomotive No. 1, Ladas, ran away on the descent, derailed and was destroyed; one passenger was killed in the only fatal accident in the line's history. The railway closed for safety improvements and did not reopen until 9 April 1897 — but it reopened, and it has run ever since. The climb rises 3,140 feet from Llanberis to a summit station at 3,493 feet, the highest railway station in Britain, just 68 feet below the mountain's top.
More than 125 years on, the Snowdon Mountain Railway is still the only public rack-and-pinion railway in the United Kingdom, carrying over 140,000 passengers a year up the highest mountain in Wales. Several of the original Swiss steam locomotives are still in service, and the line's little rack engines inspired the Reverend W. Awdry's fictional Culdee Fell Railway in the Railway Series — proof that a Victorian mountain railway can still fire a child's imagination.
Frequently asked
How does a rack railway work?
Ordinary trains rely on the friction between wheel and rail, which fails on steep gradients. A rack railway adds a toothed rail between the tracks that meshes with a gear under the locomotive, letting it climb slopes of 1 in 5.5 that no adhesion train could manage.
Can you still ride to the summit today?
Yes — a return journey takes about two and a half hours including a stop at the summit, and the line runs from late March to late October, closing for winter. In bad weather trains may stop short of the summit.
Why was a Welsh railway built with Swiss engineering?
The rack system was Swiss, the locomotives were built in Winterthur, and the unusual 800 mm (2 ft 7½ in) gauge was chosen by the Swiss engineers. The mountain's gradients left no British precedent to copy.
Why it matters today
Snowdon proved that railways could conquer mountains, not just cross plains — the rack-and-pinion system it pioneered in Britain still carries tourists up peaks from the Alps to the Andes, and its little engines still run the same climb today.
More in Railways & Transport
All →The London Underground
The world's first underground railway — steam trains in gas-lit tunnels that carried 38,000 Londoners on day one.
The Forth Bridge
A red steel giant across the Firth of Forth — the first great steel bridge in the world, opened by the Prince of Wales with a golden rivet.
The Orient Express
Paris to Constantinople in three nights of polished mahogany and white linen — the train that turned a railway journey into a legend.